Step 5. Installing Quicktrim Roof Edge System (continued) |
|
Page 12 |
|
When butting lengths of trim together, ensure that a section
of foam seal is positioned between the joint. The top edge
of the trim should be level or just below the surface of the
roof deck waterproofing. Finely fix the joint clips by
applying a bead of silicone to one side of the joint, then
hook the clip under the bottom edge of the trim and snap the
top edge over the top. Quicktrim Check Kerb Cut the Check kerb to required lengths allowing a 3mm expansion gap at all joints. Tidy up cut ends with fine sandpaper. Press the kerbs down firmly compressing the foam seal on to the membrane surface, then gently hammer the fixing pins through the slotted fixing points. Pre-drill additional slotted fixing holes to suit any cut lengths. When butting lengths of trim together, ensure that a section of foam seal is positioned between the joint. Finely fix joint clips by applying a bead of silicone to one side of the joint, then hook the clip under the bottom edge of the trim and snap the top edge over the top (see Fig. 2). Upstands The underlay will already be placed up the adjacent wall to about 50mm height from the the roof surface. The extra strip of Top Sheet should be applied to the wall and brought down on to the slate surface deck to cover the upstanding section. The detailing strip and deck should be bonded together with Coldseal Lap Mastic. |
![]()
|
Copyright (c)1999 SLE Cladding Limited.