INFORMATION REQUIRED TO
MANUFACTURE ORDERS.
- Name, depth and coverwidth of profiled top
outer sheet.
- What class of fire rating is required for the
top sheet ? Class O, Class 1, Class 2 or Class 3
- What class of fire rating is required for
bottom sheet? Class O, Class 1, Class 2 or Class 3
- Length of Sheet. (A)
- Viewed from the eaves, are the FAIR's to be
laid from right to left or from left to right? and how many of
each.
- Cut back (C) required at end of FAIR's to facilitate overlap
of next sheet or at eaves to provide overlap of gutter.
- Depth of insulation required. (E)
- On each size of FAIR's, the number of purlins
to be spanned. A single span is 2, a double span is 3 and a triple
span is 4 etc.
- Distance between purlin centres. (B) These centres
may vary, check them all.
- Top Lap. (D). Not usually required.
|
|
IMPORTANT.
On entering the Order Form to request a quotation or place an order you will be faced with a
wide choice of sheet materials, thicknesses and insulation values from which to construct
your F.A.I.Rs. SLE Cladding Ltd are cladding merchants and as such sales staff
are not qualified to advise on these products and on insulation
values.
If your requirements (as are most
requirements) are just for the basic, standard lowest cost F.A.I.Rs, just tick the
pink boxes in the materials sections and provide the required measurements. Persons enquiring or ordering the
higher specification products will be presumed by our staff to have the
necessary qualifications and knowledge in that field and to instruct them
accordingly.
|